Preconstruction
Services
Our Senior Estimator,
is responsible for cost control on this project during
the important preconstruction phase. All estimates are
prepared using Timberline Estimating system which is
able to transfer bid information from the original estimate
through to the AIA billing.
Our estimating department
is well equipped to provide a full range of estimating
services including evaluation of architectural plans
and specifications, quantity takeoffs, value engineering,
comparisons of design alternatives, preparation of estimates
from conceptual to competitive bid.
On all of our projects
our estimators work closely with both the owner and
design professionals to provide Value Engineering (VE)
services that enable the project to be completed within
the budget without impacting the design intent.
For your project, the
first step in the preconstruction process would be to
put together a master schedule of the preconstruction
phase. This schedule would be created, updated and distributed
for each meeting. The schedule would include input from
all stakeholders and would contain time lines and milestones
for design and budgeting activities during preconstruction.
We realize that cost
estimating services are critical to the success of this
project. Our estimating department will work closely
with both the owner and architect to insure that project
budgeting requirements are achieved.
In order to accomplish
this, they will review the schematic design drawings
to prepare the initial preliminary budget. As preconstruction
continues, they will update and refine the budget as
required with one budget provided in each of the major
design phases. As new budgets are generated, variance
and comparison reports will be provided to aid in decision
making.
During this estimating
process our estimators will also be providing a Value
Engineering report for consideration. They will work
closely with all design professionals (architect, civil,
structural, mechanical) and Christ's Church of the Valley
to make sure that you get the most ‘bang for the
buck'. Their recommendations will be aimed at providing
value; the right product for the best price without
compromising the design intent.
They will also work closely with the Architect to determine
effective methods of construction (constructability
reviews) prior to the development of detailed plans
and specifications. They will also review the drawings
at all critical phases to further evaluate the building
systems, make recommendations regarding constructability
and suggest alternate methods and materials as needed.
When the drawings are
complete, they will solicit competitive bids from our
subs and suppliers which will form the basis of the
final estimate. CRD has developed ongoing relationships
with some of the finest subcontractors and suppliers
in the area. We maintain an active database of 1500
subs & suppliers who service the area with a committed
core group of approximately 200 subcontractors and suppliers
who perform the majority of our work. This group enables
CRD to provide competitive pricing for all required
trades.
All subcontractors will
be preselected and invited utilizing ‘win fax'
followed up by personal phone calls by our estimating
staff. This enables us to insure that we receive strong
subcontractor coverage on all trades. Once the sub expresses
interest, CRD prepares and transmits a bid package including
all relevant plans and specs. Addendums are forwarded
as required. We also maintain a plan room and encourage
subs to come in to review the plans. Our estimators
make themselves available for questions, clarifications
etc.
As bids come in, our
estimating staff log in and review each estimate to
determine if the scope is covered, to identify exclusions,
omissions, clarifications etc. Bids are collated by
line item numbers in bid files for comparisons. Subcontractor
prices are entered into Timberline (Estimating software)
as part of the cost of construction with any adjustments
made to insure that the line item is covered.
Once this is complete,
our estimating department will present a spreadsheet
that will clearly outline all costs associated with
the project including a breakdown on each line item
in all 16 divisions as well as costs for contingency,
overhead and profit. We utilize an open book policy
and would review each and every subcontractor and supplier
bid that has been received with recommendations for
subcontractor selection. Once this process is complete,
we will provide a Final Estimate for your consideration
and approval. Once the price has been agreed upon, we
can pre-order any material with long lead times.
During the construction
phase, our Project Manager will be responsible for cost
control. An extremely important area of cost control
relates to change order management. While the construction
management approach will certainly significantly minimize
the number of change orders, it has been our experience
that there will be some owner initiated change orders.
CRD uses the Primavera change order management system
to track all changes from the initial cost estimate
through approval which will enable both the owner and
architect to identify the impact of any change on overall
project costs and schedule. |